Public Consultation

Carnagat Lane, Newry

Planning context

This page explains what has already been decided, what we're asking the Council to consider next and how you can get involved.

Conceptual CGI of proposed development

Where is the site

The site is on land east of 31 Chancellors Road and 55 metres south-west of 5 Carnagat Lane, Newry, BT35 8WY. It covers about 2.3 hectares (roughly five and a half acres) and is currently open agricultural land.

It sits just west of the A1 dual carriageway, which gives quick access to Belfast to the north and Dublin to the south. The A1 can be reached via Camlough Road, about 1km north, or Doran's Hill Roundabout, about 1.4km south. The area is rural in character, but Chancellors Road already has many large warehouse and industrial buildings along its length.

Is the land zoned for this kind of development?

Yes. The site lies within the settlement limit of Newry, in an area the Banbridge, Newry and Mourne Area Plan 2015 zones for economic development. The zoning, known as NY69 "Economic Development Chancellors Road", covers around 19.5 hectares, and our site is a small part of it.

What has already been approved?

Outline planning permission was granted by Newry, Mourne and Down District Council on in December 2024 (reference LA07/2022/1357/O). This means the Council has agreed that industrial and storage units, use Classes B2, B3 and B4, and associated road improvement works are acceptable in principle on this land.

These three use classes include: B2: light industrial, such as workshops and small-scale manufacturing, B3: general industrial, such as larger-scale manufacturing or processing and B4: storage and distribution, such as warehouses.

The outline permission did not fix the detailed design. Those details were "reserved" for a later application, which we are now consulting on the full planning application.

Proposed ground floor layout plan. Click to enlarge

Proposed first floor layout plan. Click to enlarge

Proposed first floor layout plan. Click to enlarge

Proposed rear and side elevation. Click to enlarge

What is included in the full planning application?

The full description of development for which planning permission is sought is the: Proposed site for industrial/storage units (Use Classes B2/B3/34) and associated road improvement works.

Our application will cover layout, scale, appearance, access and landscaping

This includes:

  • the size, height and position of the buildings

  • the materials and finish of the buildings

  • the design of the site entrance, internal roads, parking and footpaths

  • the detail of the road widening and junction realignment

  • planting, boundary treatment and the wildlife corridor

  • drainage and any other details required by the conditions of the outline permission

Double check with decision notice as to what the reserved matters covers

What stage is the application at?

A Proposal of Application Notice (PAN) was submitted in September 2026 to Newry, Mourne and Down District Council to notify them of our intention to submit a major planning application.

Following the completion of the PAN process, we will seek to submit a full planning application to the council. Before we do, we're sharing the designs with the community and asking for feedback on the detail. We’ve notified the community and local stakeholders about this consultation through local leaflet drop to properties in the surrounding area, a public notice in the newspaper and, emails to elected representatives for this area within Newry, Mourne and Down District Council.

When the consultation closes on Friday 20th November 2026 at 5pm, the project team will review all the feedback and consider whether any changes can be made to the designs. A consultation report will be produced, in which we'll summarise what we heard, and how we've responded. This will be submitted with the application.

Once the application is lodged, the Council will carry out its own formal consultation and notify neighbouring properties. Comments made then go directly to the Council's Planning Department, who will consider them when deciding the application. Because the principle of development has already been approved, comments at that stage need to focus on the detailed design.